Abstract
Early contractor involvement is a topic that has attracted attention from construction practitioners and researchers in the UK since the 1990s. It
has been adopted to introduce construction knowledge and experience to the
design process, and to integrate design with construction. In contrast with the
limited number of previous studies on early contractor involvement, which
used case studies, a questionnaire survey was conducted in this study, to investigate the application of early contractor involvement in current practice
and its impact on project performance in terms of time, cost and quality. From
an analysis of the questionnaire results, early contractor involvement is found
to be increasingly used in the construction industry, and to have a significant
impact on cost and time performance. This research provides empirical
evidence related to the practice of early contractor involvement. It demonstrates
the major influence of early contractor involvement on management processes
and working relationships during a project, which contribute to performance
improvement and project success.
| Original language | English |
|---|---|
| Pages (from-to) | 339-351 |
| Number of pages | 13 |
| Journal | International Journal of Project Organisation and Management |
| Volume | 7 |
| Issue number | 4 |
| DOIs | |
| Publication status | Published - 2015 |
Keywords
- early contractor involvement
- project performance
- design
- construction